top of page
THE BATHS RE-BUILD, SORRENTO
RACM had the privilege of been engaged under a Construction Management type contract working directly with the restaurant owners to ensure the Baths re-build was delivered on time and within budget. We delivered the project in under twelve months, which was one month ahead of the schedule program.
Project features; Rammed timber piles, ironbark posts, oak timber flooring, spotted gum decking, black-butt seating, scyon weatherboard cladding, timber windows and acoustic ceilings.
“What we were able to achieve in a year and one week, from fire to reopening, is pretty impressive and in no short measure to Richard and the RACM team. The key was the good relationship between owner and the builder which made the build so easy.”
- James Gibson
bottom of page